Project History - All

  DATE DESCRIPTION
October 1, 2016 Versabar_s Claw lift device removed a 400-ton deck from the Gulf.,Yes
September 22, 2016 Versabar_s twin Claw assemblies recovered a 2,100-ton topside from 300 feet beneath the surface of the Gulf.
September 2, 2016 Versabar's VB 10,000 heavy lift vessel removed a 2,000-ton jacket from the Gulf of Mexico.
August 25, 2016 Versabar's VB 10,000 heavy lift vessel removed a 2,000-ton jacket from the Gulf of Mexico.
August 18, 2016 Versabar's VB 10,000 heavy lift vessel removed a 600-ton jacket from the Gulf of Mexico.
August 18, 2016 An 1,850-ton jacket was removed and towed 140 miles to Sabine, where 14-foot pile sections had to be cut away before the jacket could fit on a barge for removal.
August 3, 2016 Versabar's VB 10,000 lift system was used to reef a 1,250-ton upper jacket.
July 31, 2016 Versabar's VB 10,000 lift system was used to reef a 450-ton upper jacket.
July 23, 2016 A 1,750-ton jacket was lifted, towed, and toppled at a reef site by Versabar_s VB 10,000 heavy lift system.
July 16, 2016 A 1,250-ton deck was removed from the Gulf of Mexico by Versabar's VB 10,000 heavy lift vessel.
July 11, 2016 Versabar's VB 10,000 removed a 1,547-ton 8-pile topside from its jacket.
July 1, 2016 A 2,250-ton jacket was lifted, towed, and toppled at a reef site by Versabar_s VB 10,000 heavy lift system.
June 23, 2016 A 1,050-ton jacket was lifted, towed, and toppled at a reef site by Versabar_s VB 10,000 heavy lift system.
June 18, 2016 Versabar's VB 10,000 removed a 300-ton quarters building.
June 11, 2016 Versabar's VB 10,000 used a unique Claw and beam rigging system to lift a 1760-ton topside in the Gulf of Mexico.
June 10, 2016 Versabar's VB 10,000 used a unique Claw and beam rigging system to lift an 1170-ton topside in the Gulf of Mexico.
June 10, 2016 Versabar's VB 10,000 used a unique Claw and beam rigging system to lift a 1620-ton topside in the Gulf of Mexico.
October 10, 2015 Versabar's VB 10,000 heavy lift system removed a 675-ton upper jacket section and placed it on a transport barge for removal.
September 23, 2015 A 2200-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
September 14, 2015 Versabar's VB 10,000 reefed a 1900-ton upper jacket.
August 27, 2015 An 1800-ton deck was removed from the Gulf by Versabar's VB 10,000 offshore heavy lift vessel.
August 20, 2015 Versabar's VB 10,000 retrieved a 275-ton platform from the Gulf of Mexico and placed it on a transport barge for removal.
August 15, 2015 Versabar's Claw grappling device was used to remove a 225-ton jacket
August 14, 2015 A 900-ton deck was retrieved from the Gulf of Mexico by Versabar's Claw
August 13, 2015 A 50-ton bridge was removed by Versabar's Claw and VB 10,000 offshore lift vessel.
August 12, 2015 Utilizing a custom-engineered lift cradle, Versabar's Claw retrieved a 375-ton jacket from the Gulf.
August 11, 2015 Versabar's Claw grappling device retrieved a 250-ton jacket from the Gulf of Mexico
August 10, 2015 A 575-ton toppled deck was retrieved from the Gulf by Versabar's Claw and VB 10,000.
August 8, 2015 Operated by the VB 10,000, Versabar's Claw was used to remove a 400-ton deck from the Gulf.
August 1, 2015 A 1700-ton decommissioned deck was removed by Versabar's VB 10,000 heavy lift system.
July 15, 2015 Versabar's Claw retrieved a 700-ton derrick from the Gulf
July 6, 2015 Versabar's VB 10,000 heavy lift vessel was used to remove a 3,500-ton decommissioned deck in the Gulf of Mexico.
June 29, 2015 A 1400-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
June 24, 2015 A 600-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
June 22, 2015 A 550-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
June 4, 2015 A 600-ton deck was retrieved from the Gulf of Mexico by Versabar's VB 10,000.
June 3, 2015 Versabar's VB 10,000 heavy lift vessel retrieved an 800-ton deck from the Gulf.
October 11, 2014 A 150' tall, 2200-ton jacket was retrieved from the Gulf by Versabar's VB 10,000 heavy lift system.
October 7, 2014 Versabar's VB 10,000 lift system installed a 2,200-ton platform in the Gulf of Mexico.
September 7, 2014 Versabar's VB 10,000 removed a 3,850-ton deepwater topside from a spar.
August 23, 2014 A 3,000-ton decommissioned topside was removed by Versabar's VB 10,000.
July 26, 2014 A 900-ton toppled deck was retrieved from the Gulf by Versabar's Claw
July 25, 2014 Versabar's twin Claw assemblies recovered a 1,600-ton deck from the Gulf.
July 25, 2014 Versabar's Claw lift device removed a 400-ton deck from the Gulf
July 24, 2014 A 500-ton deck was retrieved from the Gulf by Versabar's Claw lift device operated by the VB 10,000.
July 5, 2014 Versabar's VB 10,000 installed a 2850-ton platform in the Bay of Campeche. This is the first job the system has performed in Mexican waters.
June 24, 2014 Versabar's VB 10,000 removed a 230-ton platform. Utilizing a non-welded seafastening method, the platform was secured to the transport barge in minutes.
April 21, 2014 Versabar's Versacutter prototype, a subsea cutting device, removed a 250-ton caisson-mounted topside by cleanly severing the structure 15 ft. below the mudline.
December 2, 2013 A 450-ton jacket and an 800-ton jacket were removed from the Gulf by Versabar's VB 10,000.
November 3, 2013 Versabar's VB 10,000 retrieved a 1,400-ton platform from the Gulf of Mexico and placed it on a transport barge for removal.
October 22 & 24 A 200-ton conductor and a 500-ton jacket were each lifted and towed for removal by Versabar's VB 10,000 lift vessel.
October 15, 2013 Versabar's VB 10,000 removed a decommissioned platform complex consisting of a 1200-ton platform, a 600-ton platform, and a 30-ton adjoining bridge.
October 3, 2013 Versabar's VB 10,000 heavy lift vessel lifted a 250-ton tripod platform and placed it on a transport barge for removal.
September 23-24 Versabar's VB 10,000 removed an 880-ton production platform and a 330-ton accommodations platform from the Gulf of Mexico.
October 22, 2012 A 700-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
October 16, 2012 A 2,450-ton jacket was retrieved from the Gulf by Versabar's VB 10,000 heavy lift system.
October 5, 2012 A 1,950-ton jacket was retrieved by Versabar's VB 10,000 heavy lift system.
September 24, 2012 Versabar's VB 10,000 removed a 1,950-ton jacket from the Gulf of Mexico.
September 24, 2012 A 2,200-ton jacket was retrieved from the Gulf by Versabar's VB 10,000 heavy lift system.
Sept 19, 2012 A 1,700-ton deck was removed from the Gulf in an upside-down position by Versabar's VB 10,000.
September 18, 2012 Versabar's VB 10,000 heavy lift system retrieved a 2,250-ton deck from the Gulf of Mexico.
September 12, 2012 Versabar's VB 10,000 moved a 1,500-ton deck and changed it's orientation in preparation for removing it from the Gulf.
September 12, 2012 Versabar's VB 10,000 moved an 1,800-ton deck and changed it's orientation in preparation for removing it from the Gulf.
September 4, 2012 Versabar's VB 10,000 heavy lift vessel was used to remove a 2,800-ton decommissioned platform in the Gulf of Mexico.
August 22, 2012 Versabar's VB 10,000 lift system retrieved a 1,700-ton platform & jacket section, rotated it 90 degrees, and placed it on a transport barge for removal.
August 16, 2012 Versabar's Claw was used to remove an 850-ton decommissioned standing platform
August 13, 2012 A 350-ton quarters building was retrieved from the Gulf by Versabar's Claw lift device operated by the VB 10,000.
August 12, 2012 Versabar's twin Claw assemblies recovered a 2,000-ton 8-pile deck from just over 300 feet beneath the surface of the Gulf.
August 5, 2012 Versabar's VB 10,000 lift system installed a 3,600-ton refurbished platform in the Gulf of Mexico.
July 31, 2012 Versabar's VB 10,000 moved a deck and jacket weighing 2,650 tons onto custom-engineered lift cradles in preparation for removal.
July 30, 2012 Versabar's VB 10,000 moved a deck and jacket weighing 2,500 tons onto custom-engineered lift cradles in preparation for removal.
July 29, 2012 Versabar's VB 10,000 lowered two 450-ton cradles to the seafloor in preparation for lift operations.
July 28, 2012 Versabar's VB 10,000 lowered two 450-ton cradles to the seafloor in preparation for lift operations.
July 22, 2012 A 500-ton toppled deck was retrieved from the Gulf by Versabar's Claw and VB 10,000.
July 21, 2012 Versabar's Claw lift device removed 300 tons of hurricane related debris from the Gulf
July 20, 2012 Versabar's Claw lift device removed 350 tons of hurricane related debris from the Gulf
July 20, 2012 Versabar's Claw lift device removed 200 tons of hurricane related debris from the Gulf
July 13, 2012 A 625-ton toppled deck was retrieved from the floor of the Gulf by Versabar's VB 10,000.
July 13, 2012 Versabar's VB 10,000 lift system retrieved a jacket base pile stub weighing 350-tons.
July 12, 2012 A 650-ton quarters building was removed from the Gulf by Versabar's VB 10,000 heavy lift system.
July 12, 2012 Versabar's VB 10,000 lift system retrieved a jacket base pile stub weighing 160-tons.
July 11, 2012 A 350-ton quarters building was placed atop a custom-engineered cradle that had previously been lowered to the seafloor by the VB 10,000.
July 11, 2012 A 150-ton jacket base pile stub was retrieved by Versabar's VB 10,000.
July 10, 2012 Versabar's VB 10,000 lift system retrieved a jacket base pile stub weighing 270-tons.
July 9, 2012 A 270-ton processing skid was retrieved from the Gulf of Mexico by Versabar's VB 10,000.
July 9, 2012 Using a lift basket, Versabar's VB 10,000 lift system removed 375 tons of hurricane related debris from the Gulf.
July 9, 2012 Using a lift basket, Versabar's VB 10,000 lift system removed 425 tons of hurricane related debris from the Gulf.
July 9, 2012 Using a lift basket, Versabar's VB 10,000 lift system removed 300 tons of hurricane related debris from the Gulf.
July 4, 2012 A 500-ton deck was removed from the Gulf of Mexico by Versabar's VB 10,000 and Claw lift device.
July 4, 2012 Versabar's VB 10,000 lowered a 450-ton cradle to the seafloor in preparation for a deck removal lift operation.
June 28, 2012 Versabar's VB 10,000 retrieved a deck from the Gulf using custom-engineered support cradles. The lift registered 2,400-tons.
June 16, 2012 Versabar's Claw lift device retrieved a 750-ton quarters building from the Gulf of Mexico at a water depth of 260 ft
June 15, 2012 Versabar's Claw lift device removed 50 tons of hurricane related debris from the Gulf of Mexico
June 15, 2012 A 200-ton conductor bundle was retrieved from the Gulf by Versabar's Claw
June 14, 2012 Versabar's Claw lift device removed 50 tons of hurricane related debris from the Gulf of Mexico
June 14, 2012 A 200-ton caisson was retrieved from the Gulf of Mexico by Versabar's Claw lift device
June 14, 2012 Versabar's VB 10,000 lifted a 1,500-ton deck and placed it atop two 450-ton custom lift cradles at the floor of the Gulf.
June 9, 2012 Versabar's VB 10,000 heavy lift system moved a 1,500-ton deck adjacent to lift cradles that were previously lowered to the the seafloor.
June 8, 2012 Versabar's VB 10,000 lowered two 450-ton cradles to the seafloor in preparation for a deck removal lift operation.
May 28, 2012 Versabar's Claw lift device removed 250 tons of hurricane related debris from the Gulf
May 19, 2012 An 8-pile jacket base weighing 300 tons was removed from the Gulf by Versabar's VB 10,000.
May 18, 2012 Versabar's VB 10,000 retrieved a 100-ton jacket base tripod from the Gulf of Mexico.
May 17, 2012 A 100-ton jacket base tripod was removed from the Gulf by Versabar's VB 10,000.
May 16, 2012 Versabar's VB 10,000 used a custom-engineered lift basket to retrieve 250-tons of debris from the Gulf.
November 7, 2011 A 2,650-ton decommissioned topside was removed by Versabar's VB 10,000.
October 21, 2011 A 3,500-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
October 12, 2011 A 4,000-ton jacket was lifted, towed, and toppled at a reef site by Versabar's VB 10,000 heavy lift system.
September 30, 2011 An 1,150-ton jacket base was retrieved from the Gulf of Mexico by Versabar's VB 10,000 heavy lift system.
September 25, 2011 A deck placed on a lift cradle was retrieved from the floor of the Gulf by Versabar's VB 10,000. The lift registered 1,500 tons.
September 24, 2011 A deck placed on a lift cradle was retrieved from the floor of the Gulf by Versabar's VB 10,000. The lift registered 1,500 tons.
September 24, 2011 A deck placed on a lift cradle was retrieved from the floor of the Gulf by Versabar's VB 10,000. The lift registered 1,500 tons.
September 24, 2011 A deck placed on a lift cradle was retrieved from the floor of the Gulf by Versabar's VB 10,000. The lift registered 500 tons.
September 23, 2011 A deck placed on a lift cradle was retrieved from the floor of the Gulf by Versabar's VB 10,000. The lift registered 1,500 tons.
September 23, 2011 Using the Claw lift device, a 1,050-ton sunken deck was lifted and placed atop a lift cradle at the floor of the Gulf.
September 22, 2011 Using the Claw lift device, a 200-ton sunken deck was lifted and placed atop a lift cradle at the floor of the Gulf.
September 22, 2011 Using the Claw lift device, a 1,050-ton sunken deck was lifted and placed atop a lift cradle at the floor of the Gulf.
September 21, 2011 Using the Claw lift device, a 1,050-ton sunken deck was lifted and placed atop a lift cradle at the floor of the Gulf.
September 21, 2011 Using the Claw lift device, a 1,050-ton sunken deck was lifted and placed atop a lift cradle at the floor of the Gulf.
September 17, 2011 Versabar's VB 10,000 lowered a 450-ton cradle to the seafloor in preparation for a deck removal lift operation.
September 17, 2011 Versabar's VB 10,000 lowered a 450-ton cradle to the seafloor in preparation for a deck removal lift operation.
September 16, 2011 Versabar's VB 10,000 lowered a 450-ton cradle to the seafloor in preparation for a deck removal lift operation.
September 16, 2011 Versabar's VB 10,000 lowered a 450-ton cradle to the seafloor in preparation for a deck removal lift operation.
September 16, 2011 Versabar's VB 10,000 lowered a 450-ton cradle to the seafloor in preparation for a deck removal lift operation.
August 14, 2011 Versabar's VB 10,000 heavy lift system retrieved a 2,500-ton deck from the Gulf of Mexico.
August 9, 2011 A 1,600-ton toppled deck was placed on a lift cradle at the seafloor, and retrieved from the Gulf by Versabar's VB 10,000.
August 9, 2011 A 900-ton custom-engineered cradle was lowered into position on the floor of the Gulf in preparation for a lift operation.
August 3, 2011 Versabar's VB 10,000 retrieved a 3,700-ton deck in an inverted position and set it on a transport barge for removal.
July 27, 2011 Versabar's VB 10,000 reposistioned a 2,700-ton jacket in preparation for removing it from the Gulf.
July 26, 2011 Versabar's VB 10,000 moved a 3,700-ton deck and changed it's orientation in preparation for removing it from the Gulf.
July 19, 2011 A 2,750-ton deck was retrieved from the Gulf of Mexico by Versabar's VB 10,000 heavy lift system.
July 18, 2011 Versabar's VB 10,000 heavy lift system retrieved a 2,750-ton topside from the Gulf of Mexico.
July 10, 2011 A 620-ton jacket was towed to the reefing site by Versabar's VB 10,000 lift system.
July 5, 2011 Versabar's VB 10,000 lift system was used in the decommissioning of a 2,600-ton topside in the Gulf of Mexico.
June 29, 2011 Versabar's VB 10,000 lift system removed a 250-ton jacket base from the Gulf.
June 19, 2011 A 1,500-ton deck was placed atop a set of lift cradles at the seafloor, in preparation for the lift to the surface.
June 18, 2011 A 1,500-ton deck was placed atop a set of lift cradles at the seafloor, in preparation for the lift to the surface.
June 11, 2011 Using a lift basket, Versabar's VB 10,000 removed 150 tons of hurricane related debris from the Gulf.
June 11, 2011 Versabar's VB 10,000 retrieved 300-tons of hurricane related debris from the Gulf of Mexico using a custom lift basket.
June 10, 2011 Versabar's VB 10,000 retrieved a 3,200-ton topside that had been stuck in 40 feet of mud in a sideways position.
June 7, 2001 A pair of custom-engineered cradles weighing 900-tons were lowered into position on the floor of the Gulf in preparation for a lift operation
June 7, 2011 A pair of custom-engineered cradles weighing 900-tons were lowered into position on the floor of the Gulf in preparation for a lift operation
May 30, 2011 Versabar's VB 10,000 lift system was used in the decommissioning of an 1,800-ton four-pile production topside.
May 24, 2011 VB 10,000 simultaneously lifted a 350-ton debris basket and a 250-ton compressor.
May 24, 2011 VB 10,000 simultaneously lifted a 350-ton debris basket and a 250-ton compressor.
November 1, 2010 The VB 10,000 retrieved a 2,900-ton hull from the Gulf of Mexico.
October 23, 2010 The VB 10,000 lifted a 2,750-ton submerged deck, using a basket to contain the structure on the way to the surface.
October 17, 2010 Versabar's VB 10,000 was used to decommission a 2,450-ton topside that had been heavily damaged by fire.
October 10, 2010 Versabar's VB 10,000 heavy lift system retrieved a 1,530-ton topside from the Gulf of Mexico.
September 24, 2010 Versabar's Bottom Feeder placed a 2,000-ton hull atop a steel cradle at the floor of the Gulf in preparation for removal.
September 8, 2010 A 900-ton cradle was lowered to the seafloor to be used as a lift basket in a removal operation
September 5, 2010 A 2,250-ton toppled deck was retrieved by Versabar's Bottom Feeder lift system.
July 30, 2010 Using a lift basket, Versabar's Bottom Feeder removed 500 tons of hurricane related debris from the Gulf.
July 20, 2010 Versabar's Bottom Feeder lift system retrieved a 1,900-ton deck from the Gulf of Mexico.
July 14, 2010 An 800-ton deck was retrieved from the floor of the Gulf by Versabar's Bottom Feeder lift system
July 12, 2010 Versabar's Bottom Feeder lift system retrieved a 750-ton deck from the Gulf
June 25, 2010 Versabar retrieved a 1,500-ton deck from the Gulf of Mexico with the Bottom Feeder lift system.
June 18, 2010 A 2,250-ton toppled deck was retrieved by Versabar's Bottom Feeder lift system.
June 11, 2010 Versabar's Bottom Feeder retrieved a 650-ton deck from the Gulf of Mexico
June 5, 2010 A 1,000-ton toppled deck was removed from the floor of the Gulf by Versabar's Bottom Feeder lift system.
May 29, 2010 Versabar's Bottom Feeder lift system retrieved a 350-ton module from the Gulf of Mexico
May 25, 2010 A 450-ton module was removed from the Gulf of Mexico by Versabar's Bottom Feeder
May 19, 2010 A 750-ton deck was retrieved from the Gulf by Versabar's Bottom Feeder lift system
October 7, 2009 Versabar's Bottom Feeder lift system removed a 1,650-ton jacket from the Gulf of Mexico.
September 29, 2009 Versabar's Bottom Feeder lift system retrieved a 1,200-ton deck from the Gulf of Mexico.
September 20, 2009 A 3,200-ton jacket was lifted, towed, and toppled at a reef site by Versabar's Bottom Feeder.
September 3, 2009 A Versabar rigging configuration weighing 100 tons was installed on Versabar's Bottom Feeder to be used in a jacket reefing operation
August 11, 2009 Versabar's Bottom Feeder lift system retrieved a 1,250-ton deck from the Gulf of Mexico.
July 27, 2009 An 1,100-ton toppled deck was removed from the floor of the Gulf by Versabar's Bottom Feeder.
July 17, 2009 Versabar's Bottom Feeder lift system retrieved an 1,850-ton deck from the Gulf of Mexico.
July 11, 2009 Two 100-ton lift baskets were lowered to the seafloor to retrieve hurricane related debris from the Gulf
July 10, 2009 Using a lift basket, Versabar's Bottom Feeder removed 450 tons of hurricane related debris from the Gulf.
July 5, 2009 A 1,250-ton derrick was retrieved from the Gulf by Versabar's Bottom Feeder.
July 3, 2009 Versabar's Bottom Feeder retrieved a 250-ton deck from the Gulf of Mexico
June 28 2009A 100-ton lift basket was lowered to the seafloor to retrieve hurricane related debris from the Gulf 0
June 27, 2009 Using a lift basket, Versabar's Bottom Feeder removed 400 tons of hurricane related debris from the Gulf.
June 22, 2009 Versabar's Bottom Feeder retrieved a 350-ton module from the Gulf
June 16, 2009 An 850-ton deck was lifted from the floor of the Gulf by Versabar's Bottom Feeder lift system
June 4, 2009 A 514-ton module was retrieved from the Gulf of Mexico by Versabar's Bottom Feeder
May 31, 2009 Versabar's Bottom Feeder lift system retrieved a 1,500-ton deck from the Gulf of Mexico.
May 24, 2009 Versabar's Bottom Feeder lifted a 266-ton deck from the floor of the Gulf. 3
May 16, 2009 A 950-ton deck was retrieved from the Gulf of Mexico by Versabar's Bottom Feeder lift system
August 28, 2008 Versabar's Bottom Feeder lift system retrieved a 1,250-ton deck from the Gulf of Mexico.
August 16, 2008 A 1,500-ton deck was retrieved from the floor of the Gulf by Versabar's Bottom Feeder.
August 8, 2008 Using a lift basket, Versabar's Bottom Feeder removed 150 tons of hurricane related debris from the Gulf.
July 30, 2008 An 800-ton deck was retrieved from the floor of the Gulf by Versabar's Bottom Feeder lift system
July 28, 2008 Versabar's Bottom Feeder lifted a 650-ton sunken deck from the Gulf of Mexico
July 18, 2008 A 400-ton module was retrieved by Versabar's Bottom Feeder
July 9, 2008 A 75-ton lift basket was lowered to the seafloor to retrieve hurricane related debris from the Gulf
July 9, 2008 A 75-ton lift basket was lowered to the seafloor to retrieve hurricane related debris from the Gulf
July 6, 2008 A 2,000-ton toppled deck was retrieved from the floor of the Gulf by Versabar's Bottom Feeder lift system.
July 4, 2008 Using a lift basket, Versabar's Bottom Feeder removed 350 tons of hurricane related debris from the Gulf.
June 26, 2008 A 1,400-ton toppled deck was removed from the Gulf by Versabar's Bottom Feeder lift system.
June 14, 2008 Versabar's Bottom Feeder lift system retrieved a 1,000-ton deck from the Gulf of Mexico.
May 30, 2008 A 1,250-ton jacket base was retrieved from the Gulf by Versabar's Bottom Feeder lift system.
May 28, 2008 A 750-ton deck was removed from the Gulf of Mexico by Versabar's Bottom Feeder. 3
May 19, 2008 Versabar's Bottom Feeder retrieved 550 tons of hurricane related debris from the Gulf
Sept 12, 2007 An 1,150-ton deck was retrieved from the Gulf of Mexico by Versabar's Bottom Feeder lift system.
August 30, 2007 Versabar's Bottom Feeder lift system retrieved a 1,000-ton deck from the Gulf of Mexico.
June 30, 2007 A 1,250-ton deck was retrieved from the Gulf by Versabar's Bottom Feeder.
June 22, 2007 Versabar's Bottom Feeder lift system lifted an 1,100-ton deck from the Gulf.
June 15, 2007 A 1,250-ton deck was retrieved from the Gulf by Versabar's Bottom Feeder.
June 13, 2007 Versabar's Bottom Feeder lift system retrieved a 1,000-ton deck from the Gulf of Mexico.

 

 

 

 

 

 

New Orleans      1111 Engineers Road     Belle Chasse, LA 70037     (504) 392-3200                                                            Houston     11349 FM 529 Road     Houston, TX 77041     (713) 937-3100